RhinoSTAK & Overwatch Product Training — Interactive

OverWatch Cost: Sales Scripts

Interactive training · adapted from the sales scripts by Carl Haehl, Sep 22, 2026 · about 25 minutes
← Resource Library Rhino U
0%

Training complete

You've read all nine scripts, passed the drill and the knowledge check. Keep the quick-fire lines handy before your next call.

Part 1 · The method

Never answer the price question with a number

These scripts are for when a customer asks "How much does it cost?" or "How does this compare to a traditional lift station?"

Answer with a question first. Then pick the script that matches the job.

Every script follows the same four beats. Tap each one.

Tap a beat to see what it sounds like.

The opener to memorize

Read it, then switch to practice mode and fill in the key phrases from memory. Tap each blank to check yourself.

"Compared to what — the pump, or the whole station over 20 years? On small, low-flow stations it's usually more up front. On larger, deep, high-head or rehab jobs it's often less on day one. And on almost every job it's less to own. Tell me about your site and I'll tell you which one you're looking at."
Part 2 · Pick the script

Match the situation to the script

The Qualify beat tells you which job you're on. Tap a situation to jump straight to its script.

Part 3 · The nine scripts

Read each script, out loud if you can

Mark each one as read when you could say it to a customer. Green dots show your progress.

Script 1 · Small stations (under ~100 gpm)"Honest up front"

Use when the flow is small and a packaged submersible station is cheap. Lead with honesty. It buys credibility for every other claim you make.

"I'll be straight with you. On a small lift station, under about 100 gpm, OverWatch usually costs significantly more up front than a basic submersible package. If purchase price is the only thing that matters on this job, this is probably not the solution.

But let me ask you — who's going to be pulling that pump when it's ragged up at 2 a.m.? Who's paying for the vac truck every year? Small stations are where wipes and rags hurt the most, because smaller pumps are more prone to ragging, and they don't have retention time. OverWatch doesn't clog, and there's no wet well to pump out. Over 20 years, the station that costs less to buy is often the one that costs more to own.

Can I run a side-by-side on 20-year cost for you? If the numbers don't work, I'll tell you."

If they push back on price: "Totally fair. Where OverWatch really wins on small sites is when clogging, odor, or confined-space entry is already a problem. Is any of that happening today? We want your worst lift stations first."

Script 2 · Larger stations"The hole costs more than the pump"

Use on new stations with larger flows or deep inverts, where the wet well drives the civil cost.

"On a station your size, the pump isn't the expensive part — the hole is. A traditional lift station needs a wet well big enough to store flow between pump cycles, deep enough to cover the pumps, plus a valve vault. That's excavation, shoring, dewatering, concrete, and backfill.

OverWatch pumps directly from the inlet pipe — no storage wet well. That means a smaller, shallower structure and a lot less dirt moved. When we price the whole station, not just the equipment, OverWatch is often the lower installed cost on day one.

Can you send me the flow, the invert depth, and the site plan? I'll give you a side-by-side of the civil scope, not just the pumps."

If they push back: "Ask your civil contractor what the wet well and valve vault alone will cost on this site. That's the number we're competing with."

Script 3 · Failing vault"Don't dig it up"

Use when the existing wet well is corroded, cracked, or failing and the default plan is a full replacement.

"So the plan right now is to tear out the vault and build a new one? That's excavation, bypass pumping for weeks, traffic control, new concrete — easily hundreds of thousands of dollars before a single pump goes in.

With OverWatch, we don't need a wet well to store sewage, so we don't need a new vault. We install in the existing structure and turn it into a clean, dry pump room. IFS has done conversions like this in a single day — an Austin high-rise went live in one day, and a New York village plant in 11.5 hours.

What would it be worth to your budget to skip the new vault entirely? Let's get eyes on the structure and I'll show you what we can reuse."

If they push back: "Even if the structure needs some repair, sealing and reusing it is almost always cheaper than excavating and replacing it. Let's price both."

Script 4 · Dry pit / wet well retrofit"Free storage"

Use when the site has an existing dry pit and wet well and needs more capacity or retention time.

"Here's something most people miss. In a dry pit / wet well station, half your structure — the wet pit — is already using its retention for storage. That leaves very little room for sewage in an emergency.

OverWatch pipes directly through the wet well, with a standpipe only for fringe emergency situations, so virtually none of your wet well is being used anymore. That frees up the old dry pit and wet well to be used as retention volume. You get a big jump in retention capacity for I&I or power outages — storage that would otherwise mean a new tank, more excavation, or just isn't possible on your site.

How much retention time do you have today, and how much do you wish you had? Let's calculate what the retrofit gives you."

If they push back: "Price out a new emergency storage tank on this site. Then compare it to reusing the concrete you already own."

Script 5 · High head"One station, not two"

Use when the TDH is high or the design calls for multiple lift stations in series.

"Let me ask you — why is this designed as two lift stations? Usually it's because of the guide rail concept. A traditional submersible seals to the discharge elbow using the weight of the pump. Push the head too high and that seal leaks back, so the design caps out and you end up splitting the lift into multiple stations.

OverWatch doesn't use a guiderail. It's a bolted, flanged, in-line connection, so it can run the higher head. In most cases, we can hit your duty point with one station instead of two.

That's one less structure, one less set of pumps, one less control panel, one less power service, and one less site to maintain — easily hundreds of thousands of dollars. Can you send me the duty point? I'll tell you if we can do it in one."

If they push back: "Don't compare our station to one of theirs. Compare it to both of theirs."

Before you quote a number on this script: IFS doesn't publish a max head rating or a head-to-head capital cost comparison online. Get those from IFS engineering first.

Script 6 · Lifecycle / O&M"The price tag vs. the bill"

Use on any job, and always when the customer is stuck on purchase price.

"The purchase price is a one-time number. The operating cost is a bill you pay every year for 20 years. Let's look at the bill.

Clogging: OverWatch has a shredding impeller and a smart drive that senses torque, reverses, and cuts through rags on its own. No 2 a.m. call-outs, no crews pulling pumps.

Vac truck: There's no wet well collecting grease and debris, so there's nothing to vac out. That's typically around $8,000 a year per station. In IFS's Village of Sherman case study, the documented savings were $8,480 a year.

Longevity: The body is stainless steel. It doesn't corrode like cast iron in an H₂S environment — it lasts for decades, so future repairs drop.

Safety: No wet well means no confined-space entry for your crews.

Multiply $8,000 a year by 20 years, and by every station you own. What's your team spending today on your worst station?"

If they push back: "You're going to pay for this station either way — once up front, or every year after. Which one would you rather budget for?"

Script 7 · Zero clogs"Our track record"

Use when the customer has been burned by "non-clog" pumps before, or doubts the shredding claim.

"Every submersible sold today says 'non-clog' on the nameplate. I'm guessing you've still pulled a few of them full of rags.

Here's what I can tell you from our own installs: Rhino Pumps has never had an OverWatch clog. Not once, across every system we've put in the ground. That's not a brochure number — that's our service department.

I can't put an exact dollar figure on a clog that never happens. But you can. What does one call-out cost you — the crew, the truck, the overtime, the vac truck, the risk of a backup or an SSO? Now multiply that by how many times a year it happens today."

If they push back: "Don't take my word for it. I'll give you the names of operators running OverWatch right now. Call them and ask when they last pulled a pump for rags."

Script 8 · Repair downtime"One source vs. many"

Use when the customer has waited weeks on a submersible repair, or is locked into one manufacturer.

"When your submersible fails, who can fix it? Only the manufacturer. The motor, the mechanical seals, the temperature and seal-fail probes — all proprietary. One source for parts, one price, one lead time. And while you wait, that station is running on one pump or on a bypass.

OverWatch uses a standard IEEE motor. If it goes down, you have a whole market of motor manufacturers and motor shops to choose from — often off the shelf. The wet end is simple to rebuild compared to pulling and tearing down a submersible, and it's done in a dry, clean room, not over an open wet well.

In our experience, repair downtime on an OverWatch is an order of magnitude less than a submersible. What did your last submersible repair cost you, and how long was that station down?"

If they push back: "Ask your current supplier two questions: what's the lead time on a replacement motor, and who else can sell you one?"

If they run Flygt

Ask questions first. Let them list the pain points themselves.

"Let me ask you about your last Flygt rebuild. How many parts were in that pump? Who did the work — your own crew, or a Flygt-trained technician? How long did you wait on parts coming out of Europe? And what did the invoice look like?

Here's the challenge with Flygt: it's a great-engineered pump, but it's a complicated one. There are a lot of parts, it takes a specialized technician to rebuild, parts often ship from Europe with long lead times, and if it isn't reassembled exactly to spec, it fails early. You pay a premium for all of that, and you're locked into one source every time.

With OverWatch, the motor is a standard IEEE motor you can source from any major manufacturer, and the wet end is simple enough for a good pump shop — or your own crew — to rebuild. Which of those would you rather be calling at 2 a.m.?"

Repair factorFlygt submersibleOverWatch
Part countHigh, proprietaryLow, simple wet end
Who can repair itSpecialized Flygt-trained techAny competent pump or motor shop
Motor sourceFlygt onlyAny IEEE motor manufacturer
Parts lead timeOften from Europe, longMotors often off the shelf
Reassembly riskPremature failure if not exactStandard, forgiving build
Repair costHighLower, competitive sourcing

Script 9 · Your people"What does it cost to lose an operator?"

Use with public works directors, superintendents, and anyone who manages the crew. It's hard to put a number on, so let the customer put the number on it.

"Can I ask you something that isn't on the bid sheet? How hard is it to hire and keep good operators right now?

Think about what a bad lift station does to your crew. 2 a.m. call-outs. Pulling a pump full of rags. Climbing down into a wet well with H₂S. Weekends on call because that one station always acts up. That's the work that burns people out and sends them to the city next door.

OverWatch takes that work away. No clogs, no confined-space entry, no vac truck, and repairs happen in a clean, dry room. Your people spend their time on planned work instead of emergencies.

What does it cost you when a trained operator quits — the recruiting, the overtime to cover, the months before the new hire is up to speed? If this station keeps even one good person on your team, what's that worth?"

Help them put a number on it. Ask for their own figures:

  • Overtime and call-out hours spent on this station per year
  • Number of confined-space entries per year (and the crew size each one takes)
  • Operators lost in the last 3 years, and how long each seat stayed empty
  • Time for a new hire to be fully trained and certified
If they push back: "You're right, it's not on the bid tab. But it's on your budget every year — it's just hiding in overtime and turnover."
Part 4 · Scenario drill

Which script do you reach for?

Ten real-world situations. Pick the script that fits best. Score 8 or more to pass.

Part 5 · Knowledge check

Do you know the facts behind the scripts?

Ten questions on the method and the proof points. Score 8 or more to pass.

Part 6 · Memorize & prove it

Quick-fire lines

Read the situation, say the line out loud, then tap the card to check yourself.

Qualifying questions: ask before you quote

Tick them off on your next call. Your ticks are saved on this device.

Proof points from IFS and OverWatch material

Use these to back up the scripts. Quote only what's published, and name the source.

ClaimDetailSource
Lifecycle savings"65% total savings over the life of the pump"; 30% energy savingsKansas correctional facility
Annual O&M savings$8,480/yr: vac truck $1,760, screen cleaning $1,920, pump unclogging $2,880, PM $1,920Village of Sherman, NY
Fast retrofitWet well converted to dry pit in 11.5 hours (Sherman); one day (Austin)Sherman, Austin high-rise
Clog eliminationKansas prison went from pump service 3× per week (26 ft deep, 48" wet well) to self-clearing; Austin 23-story tower had 6 faults in 2 months beforeKansas, Austin
Shallower excavation"Significantly shallower" excavation footprintFluid Handling Pro
Materials and controlsStainless steel body for corrosion; patented DIPCUT shredding impeller; VFD that senses torque and reversesIFS OverWatch page
Flow range and efficiencyUp to 1,500 gpm; impeller options DIPCUT ~70%, vortex ~50%, high-efficiency ~85%Rhino — Why the wet well is dead
Local track recordCity Creek Mall: zero overflows, zero clogs needing intervention, zero unplanned downtimeRhino — Why the wet well is dead
Installed base2,000+ installs globally; 400 in the U.S.; 29 by Rhino in the West, 58 more in progressFluid Handling Pro, Rhino OverWatch

IFS doesn't publish a max head rating or a head-to-head capital cost comparison online. Get those from IFS engineering before quoting a number on Script 5.

← Back to the Resource Library